Advertisements
Spread the love

 

Federal Government of Nigeria has resumed  operations on the Port-Harcourt-Aba railway. This is following the completion of its rehabilitation. The PH to Aba operation forms part of the ongoing work at the 1443km Port-Harcourt-Maiduguri narrow gauge rail project.

As a test run on the route, the Federal Government has announced free passenger train ride for four days on the rehabilitated Port Harcourt to Aba railway.

The Permanent Secretary, Ministry of Transport, Oloruntola Oluremi, said the free train ride would be from May 1 to May 4.

“There will be free train ride between Port-Harcourt and Aba on the 1st, 2nd, 3rd and 4th of May 2024.

“The train will be departing Port-Harcourt everyday by 8am for Aba. It will also be departing Aba every day for Port -Harcourt by 3pm. Full commercial operations resume on Tuesday 7th May 2024,” the statement reads.

The resumption of the Port Harcourt-Aba rail operations is part of the intensified drive by the Federal Government to facilitate trade. It is also to enhance mobility, accessibility and ensure connectivity between the Southern parts of the country to the North-Eastern part.

Inaugurating operations on the rehabilitated 62km rail corridor on Tuesday, the Minister of Transportation, Sen. Said Alkali, said his Ministry was in discussions with an investor on retrofitting locomotives from diesel to CNG. This, he said, is to further bring down the cost of transportation.

Alkali, who took a train ride from Port Harcourt to Aba, said the ride signaled the commencement of passenger train services along the corridor.

He said the corridor would be linked to Enugu and connected to the Onne and Port Harcourt ports to stimulate commerce.

“We give God the glory that we are here to commission the train service from Port Harcourt to Aba.

“And to thank the Commander-in-Chief, President Bola Ahmed Tinubu for his support and commitment to the Ministry of Transportation. This is out of his desire to bring succour to the people of this great country.

“The Eastern narrow gauge covers five geopolitical zones of the country. It covers South South, South East, North Central, North West and North East.

“So, it means a lot to the government of President Bola Ahmed Tinubu. I am happy that today one segment is being put to use. And this is the first presence of the Railway Corporation in the South-South.

“So, we are prepared, we are going to ride on the train from Port Harcourt to Aba. And from today, the passenger train will commence.

“By the grace of God Almighty, from Aba, we are going to proceed to Enugu. And from Port Harcourt to Onne Port and Port Harcourt Port. So, that we will be able to put freight service in the haulage.

“The ministry is considering a lot of things. As we speak, we have engaged an investor on retrofitting our locomotive from diesel to CNG. This is to further bring down the cost of transportation,” the Minister said.

The 144 km Port-Harcourt to Maiduguri narrow gauge rail rehabilitation project was awarded by the Federal Ministry of Transportation to China Civil Engineering and Construction Company (CCECC) on October 16, 2020. It has a completion timeline of 36 months.

Upon assumption of office, President Tinubu continued with the project, which commenced in March 2022. The President, however, ensured that the Port Harcourt to Aba corridor was completed.

 

 

 

Loading

By IVNTV

Leave a Reply

Your email address will not be published. Required fields are marked *